HOUSTON – (Realty News Report) – Transwestern Real Estate Services and Molto Properties announced the groundbreaking for the West Gulf Bank Distribution Center, a new 115,642-square-foot distribution building positioned near the busy intersection of Beltway 8 and Highway 290 in Northwest Houston. The project reinforces continued industrial development in the region and expands logistics capacity in one of Houston’s most active submarkets.
Armstrong Relocation, a major moving company, has committed to occupy the building when construction is completed in September. The committed tenant underscores the facility’s purpose as a modern, functional distribution and service hub designed to support both current operations and future growth.
Transwestern’s local team played a central role in the project. Managing Director Nick Peterson, SIOR, and Executive Managing Director John Ferruzzo, SIOR, represented Molto Properties in the acquisition of the land and in the development process. The same Transwestern team also provided brokerage services to facilitate the subsequent sale of the land and completed building to Armstrong Relocation.
Molto Properties Vice President Chad Parrish commented on the location and strategic value: “We look forward to working with Armstrong Relocation to deliver a best-in-class facility tailored to its operational needs. The infill site at Beltway 8 and Highway 290—situated in the highly sought-after Northwest submarket—provides exceptional access to Houston’s primary transportation arteries. This facility will be an enduring asset that supports Armstrong’s business now and accommodates future growth for years to come.”
Located within Brookhollow West Business Park at 9700 West Gulf Bank, the West Gulf Bank Distribution Center is being developed in the heart of Northwest Houston, an area favored by logistics and industrial users for its proximity to major highways and regional distribution routes. The building’s design accommodates practical logistics requirements, including 97 car parking spaces, 24 trailer parking spaces, 28 loading docks, plus two drive-in doors and ramps to support efficient loading and unloading operations.
The West Gulf Bank Distribution Center is part of a broader wave of industrial construction activity that was announced in the Houston market in late March 2021. Several notable projects reflect strong demand for modern distribution and last-mile facilities across the metro area.
Trammell Crow initiated construction on Seton Lake Logistics Center, a speculative industrial building measuring 255,704 square feet. The project is located on Highway 249 at Seton Lake Drive, a short distance south of the Beltway 8/Highway 249 interchange. Rosenberger Construction is serving as the general contractor, and CBRE is handling leasing for the development.
Amazon announced development of four additional last-mile delivery stations in the Houston area totaling approximately 860,000 square feet, with individual stations ranging from roughly 140,000 to 360,000 square feet and scheduled to open in 2021. These last-mile locations are supplementary to two larger Amazon facilities—each about 1 million square feet—that were already under construction in suburban Houston at the time.
Realty 1 Partners, based in Richmond, Texas, began construction on the Point West Distribution Center in Brookshire. The project, a 133,900-square-foot industrial distribution facility at 32303 US Highway 90, is being built by Arch-Con Corporation as general contractor and is being leased by Boyd Commercial. The site is near an existing large Amazon distribution facility, supporting the area’s concentration of logistics activity.
March 27, 2021 Realty News Report Copyright 2021
File: Northwest Houston Warehouse Groundbreaking by Transwestern and Molto
For more on Texas development, see the book Houston 2020: America’s Boom Town – An Extreme Close Up by Ralph Bivins.
File: West Gulf Bank Distribution Center. Northwest Houston warehouse groundbreaking by Transwestern and Molto. 115,642-SF distribution building near Beltway 8 and Highway 290. Tenant: Armstrong Relocation. Related projects include Seton Lake Logistics Center, Amazon last-mile stations, and Point West Distribution Center.
Image: Rendering courtesy Transwestern








