Memorial Hermann The Woodlands South Tower Tops Out, Expansion Nears Completion
HOUSTON – Construction has officially topped out on a nine-story expansion to Memorial Hermann The Woodlands Medical Center. The addition marks a major milestone in a multi-year project designed to increase patient capacity and services for the rapidly growing Woodlands community.
The expansion project, which broke ground in early 2020, is planned to be ready to receive patients as a Level II trauma center by the spring of 2022. The Woodlands is a 28,000-acre master-planned community developed by Howard Hughes Corp., located roughly 27 miles north of downtown Houston.
JLL’s Project and Development Services team, which is managing the construction, announced the topping out of the 365,000-square-foot South Tower addition to the existing Memorial Hermann medical tower at 9250 Pinecroft. The project brings together a team of experienced firms: Austin Commercial is serving as general contractor, PhiloWilke is the project architect, and SSA is the engineering firm on the job.
JLL professionals James Selmser, Mark Harrison, Daina Pitzenberger, Steven Donnelly and Rosanna Brock collaborated closely with Memorial Hermann Hospital System leadership, including CEO Justin Kenrick, COO Jason Glover, CNO Catherine Giegerich and Vice President of Marketing Linda Nelson, to oversee construction and ensure the design supports the health system’s goals for innovation in patient care and operational efficiency.
“Through this process, we’ve worked to ensure that this tower was built exactly for the patients and providers who will utilize it every day,” said Memorial Hermann CEO Justin Kenrick. “The addition of the South Tower will provide much needed additional capacity and services to the current area. Memorial Hermann is honored to serve The Woodlands community and looks forward to the future.”
The hospital’s expansion incorporates lessons learned from the COVID-19 pandemic, with design elements that improve infection control, circulation and adaptability. Waiting areas have been configured to allow for enhanced social distancing. The tower also includes flexible, quick-turn spaces that can be repurposed as needs change, strategically located emergency entrances to streamline triage and patient flow, and increased clearance and routing for medical equipment and machinery to improve operational logistics.
Parking capacity has been increased to support the larger facility. Two floors were added to the adjacent parking garage, providing an additional 404 parking spaces for patients, visitors and staff. The northeast surface lot was also expanded by another 200 spaces. Inside the hospital, the completion of the South Tower will be followed by renovation of approximately 146,000 square feet of existing space to integrate the new tower and update clinical and support areas.
JLL’s Project and Development Services group manages design, development and construction for commercial real estate projects and plays a central role in coordinating contractors, consultants and hospital leadership to deliver complex healthcare facilities on schedule and to required standards. This expansion at Memorial Hermann The Woodlands underscores a broader effort to expand critical-care capacity and modernize infrastructure in growing suburban markets.
The South Tower addition not only increases the hospital’s footprint and service capacity but also aims to enhance the patient experience through intentional design. Improved wayfinding, better separation of clinical and non-clinical circulation, and thoughtfully scaled waiting and family support areas were part of the planning process to create a more comfortable, efficient environment for patients and caregivers alike.
May 3, 2021 Realty News Report. Copyright 2021.
File: Expansion of Woodlands Hospital Nears Completion
For more about Texas real estate, see the book Houston 2020: America’s Boom Town – An Extreme Close Up by Ralph Bivins. Available through regular book retailers.
Image: Rendering courtesy: JLL








